More jobs:
Senior Taktical Control Specialist
Job in
Dallas, Dallas County, Texas, 75215, USA
Listed on 2026-03-01
Listing for:
JPI.com
Full Time
position Listed on 2026-03-01
Job specializations:
-
Engineering
Operations Manager -
Construction
Operations Manager
Job Description & How to Apply Below
** About The Company**## Built on a foundation of integrity, respect, and commitment, JPI stands out as one of the most active real estate developers and builders in the nation. For more than 35 years, JPI has designed and developed communities with best-in-class homes and amenities. JPI is committed to data-driven management and continuous improvement. Its team of experts utilizes data – including unparalleled market research, proven business processes, and proprietary models – to ensure that every decision is strategic, focused, and produces exceptional multifamily communities with the best risk-adjusted returns.
More than just great communities, JPI is focused on leaving a lasting impact on the communities where we build and is continually committed to “Building What Matters.” JPI operates as a subsidiary of Sumitomo Forestry, which is recognized as one of the largest home builders in the United States.
About the Job The Senior Taktical Control Specialist will be responsible for status and updating takt schedules and manages the Integrated Project Schedule while implementing Takt best practices, phasing plans and checklists. The position will report to the Taktical Manager.
** Essential Functions & Responsibilities
**** Validate initial project phasing plans utilizing JPI Production System best practice
*** Validate and ensure project phasing plan built by upstream function still holds true based on project requirements
** Create visuals for site phases, building rough and finish zones
*** Create final outputs for site stages, rough and finish zones for the project
** Set up OPC, Takt interface, Inspection, and Checklists for projects
*** Build out the OPC plan for projects based on predefined nomenclature for stage, sequence, and layers
* Set up and validate the Takt interface SharePoint dashboard for the project
* Validate and input inspection requirements for the project in OPC to set up trackers
** OPC updates
*** Review OPC for allocated projects daily to ensure the latest and greatest site progress is captured by the field ops team
* Continuously run plan health diagnostics and check for logic/tie breakdowns and fix as necessary
* Update the OPC plan/ resequence based on feedback from the Technical Project Lead
* Ensure the latest and greatest plan is reflected in OPC at all times
* Troubleshoot/support the field ops team with any OPC-related technical concerns
* Authorized to make changes to the OPC plan per consultation with the Technical Project Lead and the Project Construction Manager
** Operate/ troubleshoot OPC as required
*** Verify/validate production reports generated by status updates to the OPC
** Expectations
* ** Act as a representative and advocate of JPI’s culture and guiding principles
* 5-day (Monday-Friday) Physical Co-location
* Daily Collaboration
* Ability to implement organized plans and break down work into clear, attainable steps
** Validate initial project phasing plans utilizing JPI Production System best practices
*** The Integrated Schedule Lead develops a pre-planning schedule that outlines the essential stages, sequences, and layers required for the project. The Taktical Control Manager and Lead take over, ensuring that the site plan is fully defined, including stages, sequences, and layers, by reviewing the OPC Schedule. The tactical control lead reviews and becomes familiar with the OPC, Takt Interface, and Construction Checklists that are set up by the Taktical Control Coordinator prior to construction start.
The Taktical Control Specialist works closely with the Construction Manager to transfer the plan and initiate construction.
** Set up OPC, Takt interface, Inspection, and Checklists for projects*
* ** OPC updates
*** The project schedule is finalized by the Taktical Control Manager and validated by the Taktical Control Specialist to establish construction with defined stages, sequences, layers, and takt interfaces. The Taktical Control Specialist is responsible for managing OPC daily, incorporating the most current job site progress based on information from the Technical Project Lead. Daily updates to the schedule are required, along with running health…
Position Requirements
10+ Years
work experience
To View & Apply for jobs on this site that accept applications from your location or country, tap the button below to make a Search.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
Search for further Jobs Here:
×