Lead Test Technician - 2nd Shift
Listed on 2026-09-12
-
Engineering
Test Engineer, Electrical Engineering, Quality Engineering -
Manufacturing / Production
Test Engineer, Electrical Engineering, Quality Engineering
About Company:
What Does Prolec GE Waukesha Do?
JOB SUMMARYTo perform a broad variety of tests on equipment and manufactured parts to determine if engineering standards, customer specification & IEEE standards have been met. Prolec GE Waukesha produces primarily 3 phase power step down transformers.
PRINCIPLE DUTIES AND RESPONSIBILITIESPrimary operating voltages range from 69kV to 230kV. This position encompasses performing the electrical tests to
1) verify the transformer controls: gauge, instrument and programmable controller operation and
2) transformer dielectric withstand and thermal capability. The controls testing involves employing VOMs and laptop computers to test circuit logic, instrument functionality and performance characteristics. The dielectric testing involves impulse testing to 1M V, Applied Potential testing >400kV, 3 phase 240
Hz induced testing >100kV and 3 phase 60
Hz performance testing.
- Turns Test
- Ratio and Polarity
- IEX and Core Loss
- DC Resistance
- Impedance and load loss
- Induced and Applied Potential
- Power Factor (INS)
- Insulation Resistance
- Heat run - Connect
- Corona and Impulse
- Special - SFRA (Sweep Frequency Response Analysis)
- BCT testing (standard & Omicron test set)
- Oil Quality testing
- Dew point testing
- Sound test
- Voltage and Current Regulator
- Special - Electrical Inspection
- Final Mechanical Inspection
- Pressure Test Procedure
- Control Box checkout
- Special - Top Cover checkout
- Final Inspection and Sign-off
- Fabrication Parts Inspection
- Current Trans. Test
- Calibrates Meters
- Rejects non-conforming materials and assemblies
- Calculates and analyzes the results of the test performed
- Prepares charts and graphs to indicate process trends
- Maintains a clean and safe work environment
- Complies with all safety policies and procedures and actively participates in defined zero harm safety culture driven initiatives.
- NOTE:
Must be able to satisfactorily perform a minimum 2 of the Special tests. May perform test in the presence of customers or their representatives during Witness testing.
Hand tools, ladders, electrical measuring meters, mechanical measuring devices, test equipment, system computer, and various computer controlled test equipment. Uses a variety of equipment to include impulse generator, Hi Pot, motor generator, power factor test kit, SFRA set, voltmeters, ammeters, watt meters, ohmmeters, bridges, oscilloscopes and wave analyzers to test a variety of equipment and manufactured parts.
MATERIALSArc flash clothing, electrically rated gloves
GENERALThe successful candidate must be able to read electrical prints, technical requirements and industry standards. All testing parameters are predicated on the transformers design characteristics. The testing is not of the "plug in the wiring harness, push the start button and note the results" genre. It requires first and foremost a safety mindset as well as the ability to configure power supplies and generators and trouble shoot electrical problems.
They must also obtain Arc flash training, follow safe electrical work practices, and take proper precautions to maintain arc flash boundaries for fellow testers and assemblers. Works under minimal supervision.…
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).