×
Register Here to Apply for Jobs or Post Jobs. X

Water Meter Installer – Houston, TX

Job in Houston, Harris County, Texas, 77246, USA
Listing for: Family Priority
Full Time position
Listed on 2026-09-23
Job specializations:
  • Trades / Skilled Labor
    Installation Technician, Field/Service Technician, Maintenance Worker, General Labor
Salary/Wage Range or Industry Benchmark: 25000 - 36000 USD Yearly USD 25000.00 36000.00 YEAR
Job Description & How to Apply Below

We are hiring Water Meter Installers for a large municipal water meter replacement project in Houston, TX

The project includes approximately involving 5/8', 3/4" and 1" water meters. Installers will replace existing meters and meter boxes, and box rests and complete required installation documentation.

This is a production-based outdoor field position for dependable individuals who are mechanically inclined, comfortable working independently, and motivated by the opportunity to earn more through productivity.

Responsibilities

We are hiring Water Meter Installers for a large municipal water meter replacement project in Houston, TX

The project includes approximately involving 5/8', 3/4" and 1" water meters. Installers will replace existing meters and meter boxes, and box rests and complete required installation documentation.

This is a production-based outdoor field position for dependable individuals who are mechanically inclined, comfortable working independently, and motivated by the opportunity to earn more through productivity.

Responsibilities

Water Meter Installers will:

  • Remove existing 3/4" and 1" water meters.
  • Activate new meter/transponder equipment.
  • Remove and replace meter boxes.
  • Shut off and safely restore customer water service.
  • Check completed installations for leaks.
  • Flush water lines after installation.
  • Identify service-line materials when required.
  • Photograph required stages of the installation.
  • Scan and document old and new meter/transponder numbers.
  • Accurately enter information into the handheld/work-order system.
  • Notify customers before temporarily shutting off water.
  • Clean the installation area and remove old material and debris.
  • Return old meters, paperwork, and project materials at the end of the day.

The project procedure requires installers to document the condition before work, expose the meter setting, install the dual check, scan the new meter and transponder, and properly complete project paperwork.

Completed installations must also be checked for proper meter direction, leaks, flushing, meter-box placement, transponder mounting, and site cleanup.

To View & Apply for jobs on this site that accept applications from your location or country, tap the button below to make a Search.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
 
 
 
Search for further Jobs Here:
(Try combinations for better Results! Or enter less keywords for broader Results)
Location
Increase/decrease your Search Radius (miles)
0
200
Filters
Education Level
Experience Level (years)
Posted in last:
Salary