×
Register Here to Apply for Jobs or Post Jobs. X

Electrical Assembly Tech - Wind Turbine Production

Job in West Branch, Cedar County, Iowa, 52358, USA
Listing for: Nordex SE
Full Time position
Listed on 2026-02-16
Job specializations:
  • Energy/Power Generation
    Electrical Engineering
  • Engineering
    Electrical Engineering
Salary/Wage Range or Industry Benchmark: 60000 - 80000 USD Yearly USD 60000.00 80000.00 YEAR
Job Description & How to Apply Below
Location: West Branch

A leading renewable energy company in West Branch, IA, is seeking an Electrical Production Technician to install and wire electrical systems in wind turbines. The role requires at least 3 years of electrical assembly experience and the ability to read schematics. Candidates must demonstrate adherence to safety protocols and collaborate with engineering teams. This position offers competitive benefits and opportunities to contribute to the clean energy transition.
#J-18808-Ljbffr
To View & Apply for jobs on this site that accept applications from your location or country, tap the button below to make a Search.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
 
 
 
Search for further Jobs Here:
(Try combinations for better Results! Or enter less keywords for broader Results)
Location
Increase/decrease your Search Radius (miles)

Job Posting Language
Employment Category
Education (minimum level)
Filters
Education Level
Experience Level (years)
Posted in last:
Salary