Material Planning Manager- Remote
Listed on 2026-08-17
-
Manufacturing / Production
Operations Management, Inventory Control & Analysis
Material Planning Manager
We’re Prime Matter Labs, a personal care product manufacturer with over 35 years of experience formulating, compounding, and filling products for some of the most successful and respected brands in the world.
We exist to bring better products to the world by empowering our customers to bring their ideas to life. We strive to be their most valuable partner, delivering a level of efficiency, service, and support unmatched in the industry.
Last year, we embarked on a bold new vision to be the leading product development and production partner in the country for emerging and established brands. To realize that vision, we’re investing at an unprecedented level in new technology, processes, and plans that will completely rethink the way that brands view and interact with their manufacturer. We’re building the platform that will allow us to serve as the foundation of our customer’s branded products, from their first sample to their million unit product run, and every step in between.
Come help us build the future of the personal care and beauty landscape, one partnership at a time.
Position Summary:The MRP Manager owns cross‑site material requirements and production planning across Prime Matter Labs’ manufacturing network. Reporting to the Director, S&OP / Planning and leading a team of site‑based Production & Supply Planners, this role ensures raw materials, components, and capacity are aligned to produce a reliable, achievable production plan at every facility. The MRP Manager will also play a lead role in defining and organizing the company’s transition to a new ERP/MRP platform, ensuring planning processes, data, and reporting are standardized and ready to scale across sites.
Responsibilities:- Lead cross-site MRP and production planning, directly managing the Production & Supply Planners at each manufacturing site (East, West, and NYC) to ensure a consistent, coordinated planning approach.
- Own the accuracy and integrity of the Master Production Schedule at each site, ensuring alignment with the consolidated demand plan, raw‑material and component availability, and equipment capacity.
- Partner with the Director, S&OP / Planning in the monthly Sales & Operations Planning process, reconciling the network‑wide demand plan with production capacity and supply constraints.
- Standardize MRP planning parameters and best practices across all sites, including safety stock levels, reorder points, lot sizing, and lead times.
- Help define and organize the company’s ERP/MRP system transition: document current‑state planning processes, define future‑state requirements, and translate them into system configuration in partnership with IT and finance stakeholders.
- Lead data readiness for the ERP/MRP transition, including item master, bill of materials, routing, and lead‑time data across all sites, and coordinate data migration, testing, and validation.
- Own user acceptance testing and training for site planners during the ERP/MRP transition, and drive adoption and change management through go‑live and stabilization.
- Coach, develop, and manage the performance of the Production & Supply Planner team across sites, setting clear expectations and providing regular feedback.
- Monitor and report planning KPIs across the network (schedule adherence, on‑time delivery, inventory turns, and plan‑to‑actual variance), leading root‑cause analysis and corrective action.
- Partner with purchasing to resolve material shortages and align supply commitments with the production plan, with particular attention to long‑lead‑time and shelf‑life‑sensitive raw materials and components.
- Identify and help resolve capacity constraints across sites, prioritizing production and coordinating trade‑offs with site leadership and the Director, S&OP / Planning.
- Serve as the subject‑matter expert on MRP/ERP planning logic and system configuration; troubleshoot data integrity issues and drive continuous improvement in planning accuracy.
- Support analysis of how the long‑term forecast impacts equipment capacity across the network, informing new‑project site assignments and future equipment needs.
- Ensure each site maintains a firm four‑week…
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).