Site Electrical Supervisor Eng
Listed on 2026-08-15
-
Trades / Skilled Labor
Installation Technician, Field/Service Technician, Electrician/ Electrician Installation
About Role
As a Controls & Electrical Supervisor at Vanderlande, you will be playing a dynamic role in which you will oversee electrical equipment installations and controls commissioning activities for small project sites. Leading a team, safety and quality are paramount, with your strong on-site presence ensuring project success. You will handle pre-commissioning, integration coordination, and testing support, facilitating smooth site handovers.
Additionally, you will play a pivotal role in training technicians and maintaining essential project documentation, contributing to team growth and quality project execution.
ResponsibilitiesInstallation Supervision
:
Organize and supervise onsite electrical activities like Installation, Testing & Commissioning of electrical components including power distribution, control panels, wirings etc. for Vanderlande material handling projects in line with the project schedule and following the agreed sequence. Contribute to creating electrical installation schedule, Review electrical drawings, schematics, and equipment specifications to ensure compliance with project requirements and electrical codes.
Controls Activities Install PLC/HMI’s. Download OT Software’s for all controllers and validate correct function of safety & control cabinets. Execute & support Pre-commissioning activities like I/O Checks, Interface test with SCADA, Field Wiring Test after power On, Mechanical Running Test (MRT). Execute or Support commissioning activities (Functionality, capacity, requirements). Execute minor changes in OT Program & perform controls troubleshooting. Support Integration, Site testing, as-built documentation, perform snagging and rectification.
Guidance
Delegate responsibilities and provide clear instructions to the onsite installation team of electrical technicians/subcontractors, ensuring that all installation work complies with quality standards and strictly adheres to Vanderlande processes.
Safety Focus
Create safe working environment by fostering a culture of safety among installations teams throughout the project execution.
Surveying Conduct feasibility surveys for installation areas. Check readiness & facilities required for installation as a part of preparation for “Startup Installation.”
Quality Control Leading by example, maintain a strong onsite presence through regular site walks and a thorough quality checks in alignment with Vanderlande standards.
Reporting & Coordination
Monitor team's progress and regularly report on work progress to the site manager.
Ensure effective coordination with subcontractors and stakeholders.
Collaborate with procurement team to coordinate the timely delivery of electrical materials and equipment’s.
Continuous Improvement
Identify opportunities for improvement of site management process and support continuous enhancement efforts.
Assume responsibility for training new technicians to enhance their skills, fostering ongoing team improvement, and promoting the core value of "Everyday Better" through lessons learned.
Support Activities
Organize and facilitate all support activities to ensure a smooth high-quality handover to commissioning and support commissioning & testing teams until handover to the customer.
Support site logistic management by organizing proper unloading and other related activities.
Responsible for activities
Perform EM Installation
Perform Field wiring test before Power-On
Perform Power-Up
Perform Safety and Area EM Inspection
Perform Pre-commissioning (Cabinet & Equipment)
Perform commission conveying.
Perform CST/IST
Responsible for deliverables
As Built Notes
Defect List
Electrical static test report
Field wiring Test Report Before Power On
Power-Up protocol test report
Cabinet test reports
I/O check reports
MRT Reports
Consulted in activities
Commission Conveying
Commission Safety Span of Control
Create Installation Spare Parts ME
Create Site Management Plan
Make EM Documentation as built.
Pre-Commission Conveying Cabinet
Pre-Commission Safety
Pre-Commission Safety PLC – Cabinet
Define Solution stage.
Detail solution stage
Minimum 5 years of experience in executing material handling projects in controls commissioning and…
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).