×
Register Here to Apply for Jobs or Post Jobs. X

MEPF Construction Superintendent

Job in Killeen, Bell County, Texas, 76542, USA
Listing for: Hoar Construction
Full Time position
Listed on 2026-06-07
Job specializations:
  • Engineering
    Civil Engineering, Building Services Engineer
  • Construction
    Civil Engineering
Salary/Wage Range or Industry Benchmark: 60000 - 80000 USD Yearly USD 60000.00 80000.00 YEAR
Job Description & How to Apply Below

The MEPF Superintendent is responsible to support the General or Senior Superintendent in overseeing the MEPF areas of a construction project through technical expertise in the key areas of Mechanical, Electrical, Plumbing and Fire protection. This position may coordinate and schedule multiple construction crews, determine construction requirements, plan procedures and ensure subcontract work meets required specifications. The position will manage the inspection of work and equipment to verify quality, safety and commissioning of MEPF project operations.

Responsibilities
  • Coordinate and manage daily field operational objectives, timelines, and goals.
  • Monitor the overall progress of a project and work site, review processes and practices within teams to ensure consistency, efficiency and quality of delivery.
  • Participate in the monitoring of the project schedule and budget and work with Senior Superintendents to maintain and update. Coordinate with the subcontractor's office for recovery plans where necessary, meet regularly with staff and subcontractors to discuss progress, obstacles, challenges and assist in removing barriers to completing work.
  • Review construction documents to determine contractual requirements.
  • Record and maintain information and produce reports such as personnel, production, project logs, status and other operational data.
  • Manage the safety of a job site by actively walking the site, participating in inspections, training and meeting with staff and subcontractors regularly.
  • Review shop drawings and submittals for conformance with project specifications. Manage/conduct MEP pre-Installation meetings.
  • Verify and document that all materials installed for the project are in conformance with the approved submittal, are handled and stored appropriately, work with owner and trade partners to resolve issues. Manage installation-procedures and methodology requirements making sure installation meets industry/manufacturer’s requirements.
  • Assist in needed updates to the Procore QAP (Quality Assurance Manual) manual, as well as developing new sections as we identify new scopes of work.
  • Keep up with industry changes and regulatory standards and trends to stay abreast of issues in the field, make adjustments to company standards project’s related sections, practices and procedures as necessary. Commit to use global means of communication to share QA related information for better outreach (i.e. memos, lessons learned). Attend classes to pursue education in order to stay abreast of industry standards and join industry groups to better self-knowledge and industry recognition.
  • Act as a liaison between the different trades requiring power, water, conditioned air to complete their work. This would also include coordinating with all trades/project staff and owners for deliveries of major equipment, systems shutdowns.
  • Assist with planning of work in relation to phased work and/or flow of work for the project as it relates to mechanical/electrical, plumbing and sprinkler systems. Also assist with planning of temporary power/lighting, water and any required ventilation and temporary heating and cooling. Planning may also be needed when working in existing spaces that require an ICRA plan.
  • Assist with reviewing cost of work related to RFI’s and change orders for MEP work.
  • Assist with reviewing RFI’s submitted by MEPF contractors to ensure they are complete. Assist with as‑builts, which should be maintained throughout the construction.
  • Assist with scheduling to ensure MEPF items have adequate time to accomplish their work. Especially as it relates to long‑lead equipment, installation, flushing, testing and inspections and start‑up of systems. Also controls and test and balance have time at the end of the project to complete their work.
  • Ensure the work performed by the MEPF contractors adheres to the project's details and specifications.
  • Review drawings to account for completeness between MERP systems. Such as all mechanical equipment shown on electrical drawings, all plumbing drains coordinated with mechanical equipment and all building automated control cabinets have power. Also review ceiling drawings to ensure…
To View & Apply for jobs on this site that accept applications from your location or country, tap the button below to make a Search.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
 
 
 
Search for further Jobs Here:
(Try combinations for better Results! Or enter less keywords for broader Results)
Location
Increase/decrease your Search Radius (miles)
0
200
Filters
Education Level
Experience Level (years)
Posted in last:
Salary