×
Register Here to Apply for Jobs or Post Jobs. X
More jobs:

Biological Sampling Support

Job in Miami, Miami-Dade County, Florida, 33101, USA
Listing for: Saltwater Inc.
Full Time position
Listed on 2026-07-20
Job specializations:
  • Quality Assurance - QA/QC
    Data Analyst
Job Description & How to Apply Below

Biosampling Support

At Saltwater Inc. we believe that high-quality data is vital to the health of our fisheries and oceans: our mission is to provide that data. We are a Women-Owned Small Business and are constantly seeking new team members who share our passion for innovation and environmental wellness.

We are currently recruiting for one position for Biosampling Support. This position will work as a contractor for NOAA's Southeast Fisheries Science Center (SEFSC) Fisheries Statistics Division (FSD). The FSD ensures the quality of collected data through compilation, quality control, and assurance. Organizing, maintaining, and developing databases (like bio profile, logbook catch record, and head boat activity report databases). Performing data analyses and extractions to support stock assessment activities (like SEDAR), general scientific inquiries, and annual reports summarizing landings and effort estimates.

Developing and implementing electronic reporting systems like the Fisheries Electronic Reporting System (FERS).

Please note that we are recruiting proactively and do not yet have this position available. If awarded the work, this will be a full-time position. Work will be performed onsite at the Miami Lab of the SEFSC. The contract has a one-year base period with a potential of three option periods.

Tasks:

Resource Surveys: The Contractor shall participate in bio sampling operations as required to understand Trip Interview Program (TIP) sampling operations, protocols, and logistical issues consisting of the following:

  • Periodically accompany both Federal and Partner TIP samplers to field sites and observe operations and assist in the collection of lengths, weights, and biological samples (primarily, but not limited to, otoliths) from a subset of commercial fisheries catches. A brief report of each trip shall be produced.

Deliverable:

  • Participation and observation of TIP Bio sampling activities. Written report of each trip will be produced no later than one week after the trip was sampled/observed. All reports shall be provided to the Chief, Survey Design, Data Management, and Dissemination Branch

Data Management Support: The Contractor shall use standard database software such as Excel and Access, as well as more advanced software such as SQL Developer and SAS, etc. to query TIP and associated data for the purposes of discovering inconsistencies and monitoring incoming data for standardization as well as producing reports for review by the Branch Chief. Data extractions in support of various analytical work by SEFSC staff may be required.

  • Use the QA/QC reporting system in the TIPS web portal to produce a quarterly report details watch SEFSC TIP sampler's adherence to established protocols. This report will include a summary page that highlights common issues or other problems that occurred during that reporting quarter.
  • Meet via phone or in person on a biannual basis with Contractor Dockside Samplers to discuss the results of the last two quarters of QA/QC report results.
  • Work to update and improve the SAS code that that underlies the QA/QC reporting tool as necessary. This will include working with the application developers to test the tool.
  • Use SQL Developer to conduct reviews of historical TIP data in order to answer user questions on past data, as well as respond to custom data requests.

Deliverable:

  • QA/QC Reports QA/QC reports shall be completed by the 15 of the third month after the quarter (e.g. Q1 report due on June 15th, Q2 report due Sept.
    15th, etc.); reports shall be provided to the Chief of the Chief, Survey Design, Data Management, and Dissemination Branch
  • QA/QC discussion with contract dockside samplers QA/QC discussions shall be completed by the end of the third month after the quarter (e.g. Q1 discussion by June 30th, Q2 discussion by Sept.
    30th, etc.); verification that discussions occurred shall be provided to the Chief, Survey Design, Data Management, and Dissemination Branch
  • Update and Improvement of QA/QC reporting tool This is an on-going task. When improvements are identified, development, testing, and implementation should occur within 3 months, dependent on developer's availability; identified improvements shall be provided to the Chief, Survey Design, Data Management, and Dissemination Branch
  • TIP Data exploration and extraction Requests for data or inquiries about data shall be responded to within 5 business days; products will be supplied within 30 days of request;
    All requests and responses shall be supplied to the Chief, Survey Design, Data Management, and Dissemination Branch, prior to response to the actual requestor.

Analytical Support: The Contractor shall assist in leading research, development, implementation, and enhancement of electronic data collection systems used in the TIPprogram.

  • Work with technology vendors to research and implement viable electronic data collection methods and/or improvements to currently developed systems.
  • Develop training materials, technical manuals, and…
To View & Apply for jobs on this site that accept applications from your location or country, tap the button below to make a Search.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
 
 
 
Search for further Jobs Here:
(Try combinations for better Results! Or enter less keywords for broader Results)
Location
Increase/decrease your Search Radius (miles)
0
200
Filters
Education Level
Experience Level (years)
Posted in last:
Salary