×
Register Here to Apply for Jobs or Post Jobs. X

Maintenance Planner

Job in Morristown, Hamblen County, Tennessee, 37815, USA
Listing for: Howmet Aerospace
Full Time position
Listed on 2026-09-04
Job specializations:
  • Supply Chain/Logistics
    Procurement / Purchasing, Logistics Coordination, Office Administrator/ Coordinator, Inventory Control & Analysis
Salary/Wage Range or Industry Benchmark: 65000 - 95000 USD Yearly USD 65000.00 95000.00 YEAR
Job Description & How to Apply Below
  • Locations 5650 Commerce Blvd, Morristown, TN, 37814, US (On-site)
  • Apply Before 09/22/2026, 04:00 AM
  • Job Schedule Full time
  • Remote Work Schedule Availability? None
  • Export-Controlled Data This position entails access to export-controlled items and employment offers are conditioned upon an applicant's ability to lawfully obtain access to such items
Responsibilities

JOB SUMMARY:

Work Order Planning (30%).

Work Order Scheduling (15%).

Material requirements planning - MRP (15%).

MP2 Administration (15%)

Project management (5%)

Key Performance Indicators – KPI (10%)

Calibration program administration (10%)

JOB RESPONSIBILITIES:

Work Order Planning

Actively participate in the receiving, approving & processing daily work request and establish priorities for jobs that are classified as ready for execution

Verify that the work request/order contains the correct information including, but not limited to department location, production center sub location, equipment , and work order type.

Actively participate in the detailed scoping out, assessment and verification of parts &/or service requirements for all jobs that has been satisfactorily evaluated and has been placed on hold due to the unavailability of requisite spare parts.

Actively scrutinize MP2 and change applicable work orders from a status of “under evaluation” to “READY” OR “work order in planning”.

Perform daily queries on MP2 Database to filter out work orders that are classified as “work order in planning” and determine completeness of part(s) requirements and appropriately follow up where necessary.

Appropriately move work orders through MP2 by changing their status whenever it is discovered that a requested parts have become available.

Reschedule work order start date to that which is consistent with the arrival of the designated parts. (Where feasible, be prepared to schedule the execution of a job approximately two (2) days after the promised delivery date derived from the PO status report.)

Close-off of completed work orders, with real resources used in order to comply with weekly metrics and sustain MP2 work historical database.

Generate weekly programmed maintenance PM’s following MP2 protocol.

Material Requirements Planning

Work with Maintenance Supervisor to generate monthly & weekly forecasts of spare parts for the jobs that will be executed in the corresponding week and month.

Where necessary, perform detail research for part(s) requirements for certain work orders and ensure that the correct part(s) information/criterion is available for submission on a Material requisition form.

Where necessary, request bill of material & quote from OEM/supplier for critical components and ensure that all the detailed information is available for submission on the material request form.

Submit detailed & complete Material requisition form to department head (or designee) for approval and ensure that the MR flow is not hindered by the approval process.

Follow-up with approved material requisition form and ensure that the requisition are processed with a priority commensurate with the urgency and delivery lead time of the requested part(s).

Follow-up with Wolseley to minimize lag time between date of the material requests submission and the date that it gets processed and submitted to the supplier.

Verify parts requested on material request form to ensure that it is not already carried under a Howmet part number.

Establish estimated part(s) delivery schedule by performing Purchase Order analysis report query on MP2.

Receive and verify the reception of requisite spares and provide appropriate notification to Maintenance Supervisor for unscheduled execution of high priority jobs that were delayed due to unavailability of needed spares. All other parts usage should be consumed on a scheduled basis.

Actively participate in the selection of parts meeting the criteria to be classified as a critical spare.

Prepare the necessary “Central stores part(s) addition form” so that the part(s) can be coded with a stock number & be incorporated under the central stores inventory system.

Work Order Scheduling Process

Actively participate in the monthly and weekly planning schedules and associated…

To View & Apply for jobs on this site that accept applications from your location or country, tap the button below to make a Search.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
 
 
 
Search for further Jobs Here:
(Try combinations for better Results! Or enter less keywords for broader Results)
Location
Increase/decrease your Search Radius (miles)
0
200
Filters
Education Level
Experience Level (years)
Posted in last:
Salary