×
Register Here to Apply for Jobs or Post Jobs. X

High School Replacement Project Lead, Snow Hill, NC

Job in Snow Hill, Greene County, North Carolina, 28580, USA
Listing for: Barnhill Contracting Company
Full Time position
Listed on 2026-07-01
Job specializations:
  • Construction
    Building Maintenance, Construction Labor / Trades, Building & Residential Construction
Job Description & How to Apply Below
Location: Snow Hill

Overview

NOTICE TO CONTRACTORS

HUB/MWBE OUTREACH SESSION

Barnhill Contracting Company has been selected as the Construction Manager @ Risk by Greene County Schools for the Greene Central High School Replacement Project in Snow Hill, NC
, and will be conducting the following HUB/MWBE Informational Session. You are encouraged to attend the following session to learn more about project participation opportunities available to you. These seminars will help to:
Learn about the project and the scope of the bid packages;
Inform and train Minority/HUB contractors in preparation for bidding this project;
Assist in registration on the State of North Carolina Vendor link;
Stimulate opportunities for Networking with other firms. This meeting will be held in-person and virtually via Microsoft Teams on Tuesday, 2/20/24 from 5 pm-6 pm.
IN-PERSON at Greene County Tech Center at 402 SE 2nd St. Snow Hill, NC 28580. Food and drink will be provided.
VIRTUAL on Microsoft Teams – Meeting : , Passcode:
Qzzt Wv.
Please note: Only subcontractors who have been prequalified by Barnhill Contracting Company will be able to submit a bid.

PROJECT

DESCRIPTION:

This project, located at 140 School Drive, Snow Hill, NC, consists of the multi-phased construction of the Greene Central High School (approximately 132,000 SQFT), site work (approximately 1708 acres), and demolition and abatement of the existing Greene Central High School (approximately 134,033 SQFT) as the last phase. Site work shall consist of grading, storm drainage, utilities, site improvements, paving, landscaping, and fencing.

The new school shall be 2 stories supported by a steel structure. The building envelope consists of masonry and metal stud walls, brick and metal panel veneers, curtain wall and storefront glazing, standing seam, and membrane roofs. Interior walls are metal stud and masonry. Interior finishes include paint, acoustic ceilings, polished concrete floors, carpet tile, epoxy flooring, ceramic tile, athletic wood flooring, VCT, typical casework, laboratory casework, and building specialties to include food service and athletic equipment.

Historically underutilized business firms are encouraged to complete prequalification submittals.

Prequalification and Submittal Details

Interested contractors should submit their completed prequalification submittals, by February 26, 2024, to Meredith Terrell at mte or hard copies can be mailed to Barnhill Contracting Company, PO Box 31765, Raleigh, NC 27622; (4325 Pleasant Valley Road, Raleigh, NC 27612).

PREQUALIFICATION FORMS CAN BE OBTAINED from our online plan room, 54da832ce3edbb, by viewing the Greene Central High School project under the Public Jobs tab or by contacting Meredith Terrell by email or phone at .
Please note: Once Bid Documents become available, they will be posted to our plan room website shown above; however only subcontractors who have been prequalified by Barnhill Contracting Company will be able to submit a Bid.
Target bid period: Mid-March 2024 to Mid-April 2024.

#J-18808-Ljbffr
To View & Apply for jobs on this site that accept applications from your location or country, tap the button below to make a Search.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
 
 
 
Search for further Jobs Here:
(Try combinations for better Results! Or enter less keywords for broader Results)
Location
Increase/decrease your Search Radius (miles)
0
200
Filters
Education Level
Experience Level (years)
Posted in last:
Salary