×
Register Here to Apply for Jobs or Post Jobs. X

Intern- Engineer

Job in Orlando, Orange County, Florida, 32885, USA
Listing for: Prince
Apprenticeship/Internship position
Listed on 2026-06-18
Job specializations:
  • Engineering
    Civil Engineering
  • Construction
    Civil Engineering
Salary/Wage Range or Industry Benchmark: 15 - 25 USD Hourly USD 15.00 25.00 HOUR
Job Description & How to Apply Below

Prince Corporate
10210 Highland Manor Drive
Suite 110
Tampa, FL 33610, USA

  • Read the entire Contract and Specifications, including all addenda thereto, and study all the Contract plans carefully. Become knowledgeable and informed of Contract and Plans
  • Prepare and maintain Technical Submittal List required under the Contract
  • Prepare and maintain Shop-Drawings Submittal Log with columns for stages of shop-drawing status
  • Prepare and maintain list of all Permits required under the contract and by local, state, and federal laws and ordinances. (Obtain copies of local, state and federal laws and ordinances, as necessary)
  • Prepare and maintain NPDES permits and file promptly prior to commencement. A Storm Water Pollution Prevention Plan (SWPPP) is required under the NPDES permit and must be filed. Records shall be kept in accordance with the NPDES and SWPPP requirements.
  • Prepare and maintain the Progress Schedule for the Project. Perform periodic updates. If the contract does not require a Schedule, then a Schedule will be prepared for PRINCE’s use and updated with an effective date of the last day of each month.
  • Must keep Plans and Specifications up to date with revisions for all sets of the Contract Plans and Specifications that were issued to PRINCE under the Contract. Require Owner/Engineer to furnish a sufficient quantity of revised sheets to update the number of sets that are required under the contract, i.e. if the Contract calls for ten sets, then the Owner/Engineer must furnish ten sets of the revised plans or specifications.

    The Engineer Intern will keep a Log of Plans and Specification or other data received from the Owner/Engineer.
  • Must require the Engineer to clearly identify on the revised plans all changes to the original Contract plans.
  • Must create a ‘take-off’ of the quantity difference and changes to the work that result from the changes in the revised plans and/or specifications
  • Send the Revised Plans and/or Specifications by email to Subcontractors and Vendors when their respective products or services are affected by the revisions
  • Must track Change Orders – The Tracking Log will include a synopsis of the described work, the Change Order amount, the revised Contract total, the date the Change Order was furnished to the Engineer/Owner for signature, and the date the Change Order was signed by the Owner.
  • The Engineer Intern must visit the entire project site at least once a day to ascertain what is or is not happening on the project
  • Must record each day, PRINCE’s principal operations and the location of those operations
  • Must record each day, the Subcontractors that are working on the project, with a description of the operations and jobsite locations
  • Must review the Foremen’s Daily Report each day for accuracy and correct cost coding
  • Work directly with the Project Coordinator to assure that all project files are organized and up to date
  • Must maintain a Log of the Plans, Specifications, and other data issued by PRINCE to subcontractors, Vendors, PRINCE’s employees, and others. Log shall include the name of the entity receiving Plans, Specifications, or other data, and will include the date on the Plans, Specifications, or other data to sufficiently describe what was furnished and when it was furnished.
  • The Engineer Intern must maintain a Quantity Log for PRINCE’s work and the work of each Subcontractor on all payment quantities, with daily totals and running totals. Measure quantities as necessary. Records will also be kept in such a way that the final records will reflect the history of the quantities by each day on the job. Must maintain the earthwork quantity by load count, and adjust that dirt quantity when cross sections are completed and calculated.
  • Must maintain and track material and supply logs and calculate yields in permanent materials incorporated into the project major supplies and fuel.
  • If the Contract allows payment for stored materials, the Engineer Intern will maintain a separate Materials Log for payment calculation.
  • If PRINCE is supplying materials, supplies or fuel to a Subcontractor, must maintain a log on such and reconcile it with the Subcontractor on a daily basis.
  • The Engineer…
To View & Apply for jobs on this site that accept applications from your location or country, tap the button below to make a Search.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
 
 
 
Search for further Jobs Here:
(Try combinations for better Results! Or enter less keywords for broader Results)
Location
Increase/decrease your Search Radius (miles)
0
200
Filters
Education Level
Experience Level (years)
Posted in last:
Salary