×
Register Here to Apply for Jobs or Post Jobs. X

Senior Master Scheduler

Job in Plano, Collin County, Texas, 75086, USA
Listing for: Luminator Technology Group
Full Time position
Listed on 2026-09-23
Job specializations:
  • Manufacturing / Production
    Operations Management, Production Manager
  • Engineering
    Operations Management
Salary/Wage Range or Industry Benchmark: 110000 - 150000 USD Yearly USD 110000.00 150000.00 YEAR
Job Description & How to Apply Below

Shape the Future of Manufacturing Execution

At Luminator, operational excellence starts with exceptional planning. As our Senior Master Scheduler
, you'll play a critical role in transforming strategic supply plans into executable production schedules that keep our business moving and our customers satisfied.
This is more than scheduling. You'll serve as the central link between Sales, Operations, Engineering, Procurement, and Manufacturing, ensuring materials, capacity, and resources align to deliver on commitments. From new product launches and engineering changes to demand fluctuations and capacity constraints, you'll drive the decisions that enable efficient, on-time production while continuously improving planning processes and system integrity.
If you're a data-driven planner who thrives on solving complex challenges, influencing cross-functional teams, and turning strategy into execution, we'd love to meet you. Position is located at our corporate headquarters in Plano, TX.

What You’ll Do ESSENTIAL FUNCTIONS Master Production Scheduling
  • Develop, maintain, and publish the Master Production Schedule (MPS) based on the approved SIOP supply plan to support customer demand, inventory objectives, and operational performance.
  • Balance production priorities, material availability, and capacity constraints to optimize schedule stability, throughput, and on-time delivery.
  • Manage schedule execution within established planning horizons, enforcing change control and minimizing disruption to production commitments.
  • Lead and develop the production planning team to ensure consistent execution of planning and scheduling processes.
Planning Systems & Master Data Governance
  • Own planning and scheduling master data within Syte Line, including planning parameters, time fences, order policies, safety stock levels, lead times, and item lifecycle controls.
  • Establish and maintain planning data for new products, engineering changes, and lifecycle transitions to ensure planning system accuracy and schedule integrity.
  • Govern planning system configuration, planning methodologies, and data quality through ongoing audits, compliance monitoring, and continuous improvement initiatives.
Material Availability & Constraint Management
  • Ensure material readiness to support production schedules through capable-to-build analysis, shortage management, and cross-functional coordination with Procurement, Operations, and Engineering.
  • Identify and resolve material constraints, inventory imbalances, and supply risks that may impact production, customer commitments, or product launches.
  • Manage planning impacts associated with engineering changes, product transitions, phase-ins, phase-outs, and end-of-life activities to minimize disruption and obsolescence.
Capacity Planning & Production Readiness
  • Develop and maintain capacity planning models to align labor, equipment, and manufacturing resources with demand requirements.
  • Monitor workload and capacity utilization, identify bottlenecks, and recommend corrective actions to maintain schedule performance.
  • Support production readiness for new product introductions, qualification builds, product launches, and lifecycle transitions by ensuring alignment of material, capacity, and scheduling requirements.
New Product Introduction & Product Lifecycle Management
  • Lead planning and scheduling activities for new product introductions from prototype through launch and production stabilization.
  • Evaluate schedule feasibility, material readiness, and capacity requirements for NPI gate reviews and product launch decisions.
  • Manage scheduling and planning activities related to engineering changes, product revisions, phase-ins, phase-outs, and end-of-life programs, ensuring seamless product transitions and continuity…
Position Requirements
10+ Years work experience
To View & Apply for jobs on this site that accept applications from your location or country, tap the button below to make a Search.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
 
 
 
Search for further Jobs Here:
(Try combinations for better Results! Or enter less keywords for broader Results)
Location
Increase/decrease your Search Radius (miles)
0
200
Filters
Education Level
Experience Level (years)
Posted in last:
Salary