More jobs:
Senior BESS Electrical Design Engineer – Grid- Storage
Job in
Reno, Washoe County, Nevada, 89550, USA
Listed on 2026-08-28
Listing for:
Redwood Materials
Full Time
position Listed on 2026-08-28
Job specializations:
-
Engineering
Electrical Engineering
Job Description & How to Apply Below
Redwood Materials seeks a Battery Energy Storage Systems (BESS) Electrical Engineer to lead utility-scale BESS design for EPC projects. You will size layouts, interface with utilities, and ensure compliance with NEC 705/706, IEEE 1547, UL 9540 and NFPA 855, while coordinating with cross-disciplinary teams.
The role demands 5+ years in solar/energy storage, with 3+ years focused on BESS design, and a Nevada PE license or eligibility with rapid licensure plans.
#J-18808-LjbffrPosition Requirements
10+ Years
work experience
To View & Apply for jobs on this site that accept applications from your location or country, tap the button below to make a Search.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
Search for further Jobs Here:
×