Fuel Cell Sealer (M22BI4) - Renton, WA
Listed on 2026-08-05
-
Manufacturing / Production
Manufacturing Engineer, Assembly, Manufacturing & Industrial Operations
Fuel Cell Sealer
Location:
910 Lake Washington Blvd N, Renton, WA – 98057
Duration: 3+ Months
Pay range: $40.00/hr - $45.00/hr plus $110 per diem (Per-diem only for non-local workers or someone who resides over 100 miles from the work location)
Start Time: 08:00 AM
End Time: 05:00 PM
Hours Per Week: 40.00
MUST BE ABLE TO WORK EITHER SHIFT.
Company will schedule/pay for flights (Mileage reimbursement is being offered if candidate wants to drive instead of fly)
Client is offering hotel reimbursement for training only while in Wichita
Training will take place in Wichita, KS
Client is offering hotel reimbursement for training only while in Wichita
Description:
- Seal, fillet and fay, cap seal, brush coat, etc. for major assemblies, sub-assemblies, precision bench and integral fuel cell.
- Apply scotch cast, leveling compound, aerodynamic seal and pressure test, working from drawings, documents, process specifications, quality control requirements and established processes and procedures.
The Company will provide appropriate assistance in job training to enable employees to perform all necessary job functions including the following:
- Work with blueprints, changes, specifications, work orders, etc. sealing to quality requirements.
- Complete required data gathering transactions to facilitate all sealer progression.
- Perform any and all required pickup, rework, fabrication, change incorporation, functional testing or check during or after final seal and/or seal progression.
- Use measuring instruments as required to accomplish work assignments
- Report and/or investigate job handicaps such as: errors, assembly procedures, tools, sequences, etc.
- Support the continuous flow of product within the manufacturing process by training, coaching and assisting employees of all classification levels.
- Document any discrepancies according to specification, process, and procedure.
- Temporarily attach parts and or assemblies, install collars and other hardware not related to drilling or countersinking.
1. Integral Fuel Cell Sealing
- Apply sealing compounds to seal fuel cell and related wing section components.
2. Additionally, the employee must have the skill and knowledge to perform one or more of the skills listed below, along with any lower level sealant level described below:
- Sealer
- Major Assembly / Large structure sealing / Aerodynamic seal
Requirements:
- Manager is mainly looking for exterior aero seal experience.
- Training includes SEA
092, SEA
083, ASY
050 and the standard online training.
ASY
050 Training Details:
- External Compliance:
To enhance specific skills common to specific areas - Audience:
Hourly Employees - Course
Description:
Area specific training for understanding sealant and the techniques in which to apply different applications of the area being trained.
SEA
083:
- Audience:
Personnel who will be performing or inspecting the sealing of integral fuel-tank structures per Boeing BAC
5504 - Pre-requisites: SEA
092 - Post Assembly Sealing of Boeing Aircraft Structures - Course
Description:
This course is designed to train personnel to safely and properly prepare, seal and inspect integral fuel tank structures to ensure the containment of fuel.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).