Relay Field Engineer — West
Listed on 2026-08-22
-
Engineering
Test Engineer, Quality Engineering
Why This Role Exists
Every protection relay and automation controller on a Tier III/IV data center must pass secondary injection testing before the system goes live — wrong trip timing or missed wiring means a failed witness test and a schedule slip. This role exists because our West Coast pipeline across California, Oregon, and Nevada needs dedicated device-level testing coverage on the ground. You test every relay and controller before energization.
When the owner's witness testing coordinator asks for trip timing data, you produce it.
- Secondary injection testing for SEL protection relays — 50/51/50N/51N elements, trip timing verification
- As-found/as-left settings documentation for relay replacements and retrofits
- CT/PT ratio verification and wiring continuity checks from relay terminals to switch gear
- GOOSE subscription verification post-installation — publish/subscribe validation on PRP networks
- Trip timing measurement against coordination study curves
- FAT bench testing: DTSC-200 ATS controllers, relay parameter verification, I/O wiring validation
Vendor Platforms: SEL, Woodward, Omicron, Doble
Software Tools:
AcSELerator, Quick Set, Wireshark
Protocols: IEC 61850 GOOSE
Standards: IEC 62439-3 (PRP/HSR), NFPA 70E, IEEE 1584
Test Phases:
Secondary injection testing, Factory Acceptance Test (FAT), Site Acceptance Test (SAT), Functional performance testing
- Performed secondary injection testing on SEL relays on an active West Coast project site
- Produced test reports in NETA/ANSI format with as-found/as-left settings comparison
- Demonstrated NFPA 70E compliance during energized MV switch gear testing
- Independently executing relay-level SAT on West Coast project sites
- Bench FAT testing for controllers (DTSC-200, easYgen 3400) with parameter and I/O verification
- Contributing to ZSI GOOSE functional testing on PRP networks
- 5+ years relay testing and electrical testing on medium-voltage power systems
- Secondary injection testing with Omicron CMC or Doble F6150 (or equivalent)
- Test report documentation per NETA/ANSI standards — as-found/as-left format
- Wiring verification: CT/PT ratio checks, continuity testing, relay-to-switch gear terminal verification
- NFPA 70E compliance: working on or near energized MV switch gear with arc-flash PPE
- NETA Level II or III certification
- SEL relay testing (AcSELerator Quick Set for settings verification)
- IEC 61850 GOOSE verification — Wireshark capture, publish/subscribe validation
- PRP network failover testing
- Based in or willing to relocate to Northern California or Pacific Northwest
Travel 40–60% during testing campaigns. West Coast sites (CA, OR, NV, WA, AZ).
Site
Hours:
early starts for LOTO, occasional weekend milestones.
Customer‑Facing Interface with prime contractor commissioning leads during witnessed testing.
Documentation Heavy — test reports, as-found/as-left records, wiring verification checklists, trip timing data sheets.
Field Safety: NFPA 70E compliance mandatory — arc‑flash PPE, approach boundaries, LOTO per relay position.
Benefits (Why Ziggurat)- Your test data proves the protection system works — settings, coordination curves, and GOOSE messaging validated by your measurements.
- Multi‑vendor relay testing: SEL, Woodward, CAT — broad platform exposure.
- Direct collaboration with the engineers who wrote the settings you test.
- West Coast data center growth puts you at the center of critical infrastructure construction.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).