×
Register Here to Apply for Jobs or Post Jobs. X

Project Scheduler

Job in St. Louis, Saint Louis, St. Louis city, Missouri, 63105, USA
Listing for: TW Constructors
Full Time position
Listed on 2026-06-18
Job specializations:
  • Construction
    Civil Engineering, Operations Manager
Salary/Wage Range or Industry Benchmark: 60000 - 80000 USD Yearly USD 60000.00 80000.00 YEAR
Job Description & How to Apply Below
Location: St. Louis

Join to apply for the Project Scheduler role at TW Constructors

Join to apply for the Project Scheduler role at TW Constructors

About Us

TW Constructors has been a leader in design/build construction, interior renovations, and construction management in the St. Louis market for over 20 years. Recognized as the Largest Minority Owned Business Enterprise in the area, our team is committed to excellence throughout the construction process. Founded on principles of collaboration and success, we focus on supporting our clients’ objectives for project longevity, sustainability, and community impact.

Our extensive network of personnel, subcontractors, and vendors ensures every detail is considered from project conception to completion, including budgeting, scheduling, and construction. At TW Constructors, we build more than facilities, we build community support and success.

TW Constructors (TWC)

Full Time

St. Louis, Mo.

About Us

TW Constructors has been a leader in design/build construction, interior renovations, and construction management in the St. Louis market for over 20 years. Recognized as the Largest Minority Owned Business Enterprise in the area, our team is committed to excellence throughout the construction process. Founded on principles of collaboration and success, we focus on supporting our clients’ objectives for project longevity, sustainability, and community impact.

Our extensive network of personnel, subcontractors, and vendors ensures every detail is considered from project conception to completion, including budgeting, scheduling, and construction. At TW Constructors, we build more than facilities, we build community support and success.



The Role

The Project Scheduler builds and maintains the project schedule and the different baselines in accordance with TWC policies, owner requirements, and the on-going analysis of the network logic and validation as it complies with the intent of the project team. Cost and resource loading including the TWC metrics and general conditions is required on all project schedules so, all report generation and cash flows will be a critical element of the role.

We are looking for someone with an entrepreneurial mindset to join our national team with a passion to work alongside engineers, architects, construction teams, and owners to make our projects more successful.

Responsibilities

  • Periodic progress updates of in-progress schedules. Collection of all pertinent data required to update the schedule. The Scheduler is responsible for collection of update data from multiple sources, including the Project Manager, Superintendent, and Owners Representatives and subcontractors. All update data shall be approved by the Project Manager prior to incorporation into the schedule.
  • Maintenance of Project Schedule Baselines. Maintains Project Schedule Baselines in accordance with TWC’s policy regarding Baselines and any additional requirements the Owner’s contracts may include.
  • Periodic Performance Report Generation. Generation of project specific Performance Reports as well as TWC Standard reports, including but not limited to:
    Critical Activities Report, Baseline Deviation Report, Earned Value Performance Index Report and Project Cash Flow Report.
  • Cost and Resource Loading of Schedules. Required at a minimum on all TWC projects to include the TWC Metrics Resource Set for project staff and General Conditions. As required by the project, updating cost and resource actuals may be required as part of the periodic progress update process.
  • Network Logic Analysis and Validation. On-going analysis of the network logic and validation that it complies with the intent of the project team and that it complies with the TWC Standard Guidelines for network logic. The network logic on-going analysis shall also include removal of extraneous and superfluous dependencies that may cause errors in calculating total float and criticality.
  • Assist in preparation of Monthly Schedule Reporting. Preparation of the required reports for the project and shall include assisting with the draft of the Monthly Schedule Narrative.
  • Schedule Development. Developing schedules from the ground up for both proposals…
To View & Apply for jobs on this site that accept applications from your location or country, tap the button below to make a Search.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
 
 
 
Search for further Jobs Here:
(Try combinations for better Results! Or enter less keywords for broader Results)
Location
Increase/decrease your Search Radius (miles)
0
200
Filters
Education Level
Experience Level (years)
Posted in last:
Salary