×
Register Here to Apply for Jobs or Post Jobs. X

Wind Technician II — Onsite Turbine Maintenance & Safety

Job in Big Lake, Reagan County, Texas, 76932, USA
Listing for: NextEra Energy Resources
Full Time position
Listed on 2026-08-30
Job specializations:
  • Energy/Power Generation
    Wind Turbine / Technician, Wind Energy, Renewable Energy
Salary/Wage Range or Industry Benchmark: 48000 - 70000 USD Yearly USD 48000.00 70000.00 YEAR
Job Description & How to Apply Below
Location: Big Lake

Next Era Energy is seeking a Wind Technician II (All Levels) on-site in Ozona, TX. You will perform preventive maintenance and troubleshooting on wind turbine systems, ensuring safety and reliability across the wind farm site.

The role requires at least 1.5 years in a technical field or a technical certificate/degree, plus the ability to climb turbines up to 300 feet. A non-CDL driver's license is required, with post-offer medical evaluation, and relocation support may be provided.

#J-18808-Ljbffr
To View & Apply for jobs on this site that accept applications from your location or country, tap the button below to make a Search.
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).
 
 
 
Search for further Jobs Here:
(Try combinations for better Results! Or enter less keywords for broader Results)
Location
Increase/decrease your Search Radius (miles)
0
200
Filters
Education Level
Experience Level (years)
Posted in last:
Salary