Wastewater Plant Operator-In-Training/I/II/III/IV; Ventura Water
Listed on 2026-08-30
-
Trades / Skilled Labor
Utility Technician, Wastewater Treatment, Maintenance Technician / Mechanic -
Engineering
Wastewater Treatment, Maintenance Technician / Mechanic
Wastewater Plant Operator
The City of Ventura Water Department is hiring a Wastewater Plant Operator-In-Training/I/II/III/IV. There is currently one vacancy that we are looking to fill immediately.
In this position, you will operate and maintain wastewater treatment plant facilities and processes on an assigned shift within a tertiary treatment plant, ensuring safe, efficient, and compliant operations. Duties range from monitoring and adjusting treatment processes to performing routine and complex maintenance on wastewater plant equipment and facilities. As you gain experience and advance through certification levels, you will take on increasing responsibility and progress toward operating plant systems independently.
The Wastewater Plant Operator series is flexibly staffed, and progression from one level to another is based upon the incumbent's acquisition of the appropriate Plant Operator certificate.
Distinguishing Characteristics
The Wastewater Plant Operator series is distinguished from the Wastewater Plant Operator-in-Training classification in that Wastewater Plant Operators are required to possess a valid Grade I, II, III, or IV Wastewater Treatment Operator certificate issued by the California Water Resources Control Board.
Wastewater Plant Operator-In-Training:
This is the entry-level classification in the Wastewater Plant Operator series and, as such, incumbents are trained in plant operations and routine maintenance work.
Wastewater Plant Operator Grade I, II, III & IV:
These are the full journey-level classes of the certified Wastewater Plant Operator series, in which incumbents work with greater independence and perform the full range of complex, skilled maintenance tasks.
Incumbents may be required to work stand-by on a rotational basis and report to work on a callback basis as needed within a designated time frame. Standby assignment is at the discretion of the Division Head.
Minimum Qualifications – Required
Wastewater Plant Operator-In-Training:
Graduation from high school or its equivalent, and one year of related training and/or experience in a field comparable to industrial maintenance, which would provide general knowledge of the mechanical trade and motorized equipment.
Wastewater Plant Operator Grade I, II, III & IV: A combination of education, training and/or experience equivalent to graduation from high school or its equivalent and education and experience commensurate with each grade level of certification as required by the state, which includes some course work in area of assignment.
License/Certificates
Wastewater Plant Operator-In-Training:
Incumbents are required to obtain a State Water Resources Control Board Grade I Operator certification within 18 months from the date of employment. Successful completion of the Grade I Operator certification at the time of application is desirable.
Wastewater Plant Operator Grade I, II, III, & IV:
Possession of a Grade I, II, III, or IV Wastewater Treatment Operator certificate issued by the California State Water Resources Control Board.
License:
Possession of a valid California Class C driver's license upon employment.
Pay & Benefits
Wastewater Plant Operator-In-Training - $ 29.04 - $35.29 Hourly DOQ
Wastewater Plant Operator Grade I - $36.34 - $44.17 Hourly DOQ
Wastewater Plant Operator Grade II - $38.20 - $46.43 Hourly DOQ
Wastewater Plant Operator Grade III - $42.00 - $51.05 Hourly DOQ
Wastewater Plant Operator Grade IV - $44.15 – $53.66 Hourly DOQ
Benefits
- Medical Insurance (HMO, PPO options)
- City Paid Dental and Vision Insurance
- Life Insurance
- Vacation & Holiday Compensation
- Deferred Compensation
- CalPERS Retirement
- Wellness Program (access to gym facility and fitness classes)
- Tuition Reimbursement & Bilingual Pay
About Ventura Water
Ventura Water provides drinking water to more than 109,000 people through approximately 32,000 water service connections. This complex water system has more than 391 miles of pipeline, 3 water treatment plants, 23 pump stations and 31 reservoirs. Our community relies on three 100% local water sources - the Ventura River, Lake Casitas, and local groundwater wells, as well as, providing reclaimed water from the Ventura…
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).