Sr. Infrastructure Capacity Program Manager, NPI
Listed on 2026-09-18
-
IT/Tech
Hardware Engineer, Systems Engineer, IT Infrastructure
Core Weave is The Essential Cloud for AI™. Built for pioneers by pioneers, Core Weave delivers a platform of technology, tools, and teams that enables innovators to build and scale AI with confidence. Trusted by leading AI labs, startups, and global enterprises, Core Weave combines superior infrastructure performance with deep technical expertise to accelerate breakthroughs and turn compute into capability. Founded in 2017, Core Weave became a publicly traded company (Nasdaq: CRWV) in March 2025.
Learn more at
We are seeking an experienced and highly motivated Sr. Infrastructure Capacity Program Manager, NPI to join our Infrastructure Capacity team. In this role, you will be the go-to infrastructure capacity partner for our Hardware New Product Introduction (NPI) and Engineering Operations teams — tracking data center infrastructure hardware roadmaps, determining ordering cut-over points, and signaling scope and BOM requirements to Capacity, Supply Chain, Construction, and Execution so that new hardware programs land in the fleet on schedule and old hardware is retired cleanly.
About the roleCore Responsibilities
- NPI
Roadmap:
Track infrastructure hardware NPI roadmaps and transition schedules across power, cooling, and network, giving Infrastructure Capacity forward visibility into what's coming online and what's being retired. - Cut-Over Point Determination: Determine the cut-over point between ordering legacy/outgoing hardware and new/incoming hardware for each site or program — weighing lead times, EOL risk, and deployment timing to avoid over-ordering hardware that's about to be replaced or under-ordering ahead of a delayed transition.
- Downstream Signaling (Scope & BOM): Signal downstream teams — Capacity, Supply Chain, Construction, and the Execution team — with clear scope and Bill of Materials (BOM) requirements as new hardware programs take shape, so each team can plan, budget, and procure in lockstep rather than reacting late.
- NPI Weekly Meeting Representation: Attend NPI weekly DC planning meetings as the standing representative of the Infrastructure Capacity team — bringing a capacity and infrastructure-readiness lens into hardware planning discussions, and carrying decisions, risks, and action items back to Infrastructure Capacity and affected downstream teams.
- Infrastructure Readiness PM & Ownership: Act as the program manager for infrastructure readiness on NPI hardware programs — driving cross-functional work streams, tracking milestones and risks, and ensuring power, cooling, network, and space readiness are in place ahead of each program's target ship/deployment date.
- Infrastructure DC NPI / Product Scaling Designs: Partner with Hardware NPI teams to translate new GPU/CPU, power, and cooling product designs into data center infrastructure requirements at scale — assessing whether existing site designs (power density, cooling architecture, rack/row layout) can support a new product generation, and defining the infrastructure scaling design changes needed where they cannot.
- Cooling & Power Architecture Transition Planning: Apply working technical knowledge of cooling and power infrastructure to plan for major architecture transitions as new hardware programs mature — for example, moves from air-cooled (AC) racks to in-rack Coolant Distribution Units (CDUs) to fully remote/centralized CDU plants — translating each transition into concrete power, space, and facility impacts for Design, Capacity, Supply Chain, and Construction.
- Rack & Network Hardware Program Support: Provide infrastructure-readiness planning for new rack-level power/cooling control hardware (e.g., rack-level power and cooling controller/monitoring modules and…
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).