Senior Material Coordinator
Listed on 2026-02-18
-
Engineering
Civil Engineering, Environmental Engineer, Electrical Engineering, Operations Manager
Requisition
Position Details- Relocation Authorized:
National - Family - Telework Type:
Full-Time Office/Project - Work Location:
Kemmerer, WY
Since 1898, we have helped customers complete more than 25,000 projects in 160 countries on all seven continents that have created jobs, grown economies, improved the resiliency of the world's infrastructure, increased access to energy, resources, and vital services, and made the world a safer, cleaner place.
Differentiated by the quality of our people and our relentless drive to deliver the most successful outcomes, we align our capabilities to our customers' objectives to create a lasting positive impact. We serve the Infrastructure;
Nuclear, Security & Environmental;
Energy;
Mining & Metals, and the Manufacturing and Technology markets. Our services span from initial planning and investment, through start-up and operations.
Core to Bechtel is our Vision, Values and Commitments. They are what we believe, what customers can expect, and how we deliver. Learn more about our extraordinary teams building inspiring projects in our Impact Report.
Project OverviewBechtel is the licensing, engineering, procurement, and construction partner on Terra Power's Natrium team. Selected by the U.S. Department of Energy (DOE) for its Advanced Reactor Demonstration Program, Natrium is participating in a DOE initiative to re-establish U.S. leadership in nuclear energy that provides matching funding to industry to design and build an operational advanced reactor. Terra Power, a leading advanced generation technology company founded by former Microsoft CEO Bill Gates, will be deploying its 345 MWe sodium fast reactor (SFR), called Natrium.
The Natrium plant features an advanced, cost-competitive reactor design that is safer, simpler, easier and less costly to construct, less expensive to operate, and able to provide energy that is competitive with fossil fuels. It also features an innovative molten salt energy storage system designed to be complementary to solar and wind power by evening out the peaks and valleys in production when the sun is not shining or the wind is not blowing.
With the reactor and energy storage output combined, the plant can produce more than 500 MWe of power.
Other Team Natrium partners include GE Hitachi Nuclear Energy, Energy Northwest, Pacifi Corp, and Duke Energy, along with support from a number of national laboratories and universities. This DOE Program has the potential to be the largest funding program for advanced nuclear power in U.S. history and will shape the future of nuclear energy for decades.
Job SummaryServes as liaison at the project site between Project Procurement for reporting of undelivered materials, Field Procurement for stored materials, and Construction personnel for accurate reporting of materials required for work package installation. Coordinates with responsible groups that materials are provided in a timely manner and in sufficient quantity to support the completion of construction work. Ensures accurate distribution of materials to Construction and/or Sub-Contractor installation locations.
Implements planned inventory control mechanisms, assists in early identification of surplus or unneeded materials, and coordinates material availability in support of design revisions or rework.
- Reports to and receives operational direction from the Materials Manager, Field Procurement Manager or Materials Coordination Supervisor if assigned.
- Maintains direct working relationship with Project Procurement, Field Project Controls, discipline Field Engineers, Field Procurement, Automation Support, Construction Superintendents, (Sub) Contractors, and site Customer personnel to ensure that Construction personnel are provided with materials to support the completion of construction work. #LI-SF1
- Implements Materials Management Plan with respect to applicable commodity groups, within area of responsibility.
- Ensures adherence to the Material Responsibility Matrix by all responsible parties.
- Utilizes the materials components of the project Automation Plan…
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).