Production Scheduler - Gas Turbine Manufacturing Repair
Listed on 2026-09-06
-
Engineering
Operations Management
Location: Houston, TX
Job :2499
# of Openings:1
About PROENERGYPROENERGY is an engineering, R&D, and manufacturing powerhouse. The company addresses every need for fast-start power generation: turbine and package manufacturing, turnkey project execution, power purchase agreements, and asset lifecycle care for turbines and plants. Where others see impossible energy challenges, PROENERGY provides innovative aeroderivative solutions.
Our FootprintPROENERGY delivers fast-start, dispatchable power solutions from worldwide centers for aeroderivative excellence. We are investing more than $1 billion through 2028 in infrastructure to serve our customers.
In Sedalia, Missouri, our 600,000 sq ft Center for Excellence in Manufacturing—a world-class investment in fast-start power and the only campus of its kind in the world—is growing by 40 percent.
In Houston, Texas, our 500,000 sq ft Center for Excellence in Lifecycle Care features a Level-IV depot and aero repair facility, which executes comprehensive services for aeroderivative engines under one roof.
In Kansas City
, we have an office with an Engineering team that supports our sought-after solutions for turnkey projects and contracted power.
And our worldwide service centers ensure local service expertise near our customers. Our expanding service footprint includes Phoenix, Buenos Aires, New Brunswick, and additional locations in Europe, Australia, and Southeast Asia.
Our PhilosophyWe take care of our people and strive to make a positive difference for the world. We offer competitive pay, excellent benefits that include Medical, Dental, Vision, and Life/Disability Insurance at minimal cost to the employee, 10 paid holidays, paid time off, and a 401K plan. If you are looking for a rewarding career and possess specialized knowledge and quality-oriented problem-solving skills, we encourage you to apply today.
Position SummaryThe Production Scheduler develops, maintains, and communicates the detailed production schedule that converts the master plan into an executable, capacity-feasible sequence of work across gas turbine manufacturing operations. Working at the operation and work-center level, the Scheduler balances demand, capacity, material availability, and constraint utilization to establish one clear sequence the floor can execute and keeps it current as conditions change.
This is the scheduling seat between the production planners and the planning manager: planners own modules and orders, the scheduler owns the sequence across all of them. Success in this role is a schedule that is realistic, stable, and defended, sequenced to what is achievable, resequenced through defined rules rather than reaction, and measured daily against execution. This position supports the GTM Repair and Overhaul value stream.
Reports To
: VP Production Planning & CI
Work Location:6401 North Eldridge Pkwy, Houston, TX 77041
Position Responsibilities- Own the integrated sequence for the repair scope: build and maintain the engine, module, and cell-level sequence across the repair value stream, driven by induction dates and turnaround-time (TAT) gate commitments — one priority across all planners and cells, not a sequence per engine.
- Manage emergent-scope replanning as the core discipline: absorb inspection findings and condition-driven workscope growth into the sequence with minimal TAT damage — resequencing within defined rules, quantifying the gate impact of each scope change, and escalating TAT-threatening growth to the planning manager the day it is found.
- Sequence around discovered material demand: work daily from the material planners’ Ready / At Risk / Short picture for parts ordered after inspection; slot materially-ready work into cells while engines wait on parts, so repair capacity stays productive without losing each engine’s place in the TAT plan.
- Pace induction release and protect flow: manage the release of inducted engines into disassembly so work-in-process stays flowing rather than flooding; protect constraint cells and shared resources as first-order scheduling objectives.
- Hold TAT gates and the scheduling window: publish and defend the rolling sequence against gate…
(If this job is in fact in your jurisdiction, then you may be using a Proxy or VPN to access this site, and to progress further, you should change your connectivity to another mobile device or PC).